
CONSTRUCTION COMPANIES

Walmart Super Center
at Blue Ridge Crossing

Noland Road Bridge

Carmax

UMKC
Health Sciences Building

The Bluffs at
Sugar Creek |
AL J. MUELLER CONSTRUCTION CO.
Blue Valley School District Campus Office Building
BARSTO CONSTRUCTION, INC.
Walgreen's Kansas City, KS
3 Schools Bonner Springs, Edwardsville, McDanield
Jesse James Amphitheater Kearney, MO
Independence Transit Center Independence, MO
CITY OF BELTON, MISSOURI
Public Water supply system project for City Engineer: Established benchmarks and ran level loops from water tower to water tower. Performed survey for topographic information along lake for drainage, and structure improvements at spillway.
CITY OF GLADSTONE, MISSOURI
Sanitary Sewer improvement project for city of Gladstone, Missouri. Topographic survey for park improvements for the City of Gladstone, Missouri.
FEYERHERM CONSTRUCTION CO.
Merriam Visitors Bureau Merriam, KS
Mission Valley Middle School Prairie Village, KS
FOGEL-ANDERSON CONSTRUCTION CO.
Legacy Ridge Lee's Summit, MO
Wal-Mart Super Center at Blue Ridge Crossing Kansas City, MO
GC CONSTRUCTION
Noland Road Bridge Independence, MO
Brookside Phase 4 Kansas City, MO
GOFORTH CONSTRUCTION, LLC
Marriott Town Plaza Overland Park, KS
HARRIS CONSTRUCTION CO.
Aldi's Food Store Kansas City, MO
J & M CONTRACTING, INC.
Independence Schools Transportation Complex Independence, MO
KANSAS CITY POWER AND LIGHT
Topographic survey of the 20 acre Dodson Service area. Small boundary surveys for easements and right of ways for various projects.
McPHERSON CONTRACTORS, INC.
Tonganoxie Middle School Tonganoxie, KS
Delaware Elementary School Wyandotte County, KS
MEGA INDUSTRIES CORPORATION
26th Street & Vernon Project
MURRAY & SONS CONSTRUCTION CO.
Ray Marsh Elementary School Shawnee, KS
ORR CONSTRUCTION MANAGEMENT
Blue Valley Ball Fields & Concession Overland Park, KS
Blue Valley Aquatic Center Overland Park, KS
Celebration Park Gardner, KS
RODRIGUEZ MECHANICAL CONTRACTORS, INC.
Consolidated Car Rental Facility KCI Airport
UMKC Health Sciences Building Kansas City, MO
Hertz Rental Car Facility Kansas City, MO (KCI)
Applebee's Support Center Lenexa, KS
Blue River Driving School Independence, MO
Blue Springs NID Blue Springs, MO
SAM ANDERSEN CONSTRUCTION CO.
Kansas City Zoo Carousel Shelter
TITAN CONSTRUCTION ORGANIZATION
Lee's Summit City Hall / City Hall Parking Garage
Bradley Elementary School Additions Ft. Leavenworth, KS
WALTON CONSTRUCTION CO.
KCI Airport Consolidated Car Rental Facility Kansas City, MO
KCI Bus Maintenance Facility Kansas City, MO
UMKC Health & Sciences Building Kansas City, MO
Hertz Rental Car Facility Kansas City, MO (KCI)
WEITZ COMPANY
The Park at Kirkwood Kansas City, MO |
PRIVATE DEVELOPERS
DEER RUN ESTATES
Project: A new subdivision of single family homes in Sugar Creek, MO (contact: Don Stump). HAJ is coordinating services of aerial mapping, outside engineering and surveying services for the project.
EASTLAND CENTER ASSOCIATES, LLC
Project: Eastland Center, a 210-acre development in southeastern Independence, MO (contact: Steve Ehrhart). HAJ provided boundary and topographical surveying, site control surveying for the entire site; layout and engineering design for various sites within the development; all surveying required for the construction of storm and sanitary sewers, water lines, lighting and individual development parcels. Work is on- going.

Lowes |

Holiday Inn Express |

Country Inn Suites |

The Townhomes at
Royal View Meadows |
STUCKER CONSTRUCTION CO.
Project: The Townhomes at Royal View Meadows a subdivision of multi-family housing, in Kansas City, MO (contact: Larry Stucker). HAJ has provided the engineering design for the plans including streets, storm and sanitary sewers, drainage area, grading, erosion control and water lines, as well as as-builts for the above. This work includes preparation of the plat drawings and lot monumentations. |
RIGHT OF WAY
AQULIA (MISSOURI POWER & LIGHT CO.)
Right of Way locations of Streets and Highways on several projects for Power Lines. Location of Boundary lines and preparing Easements for Power lines.
SELECTED CROSS COUNTRY PIPE LINE ROUTE SURVEYS AND MAPPING EXPERIENCE
These jobs included surveying the routes (preliminary routes) and mapping the right of ways, construction staking for the centerlines of the pipelines, and doing all the necessary permit drawings, writing the easements, and drawing the survey plats necessary for the purchase of the right of ways.
WOOD RIVER PIPELINE, BASED OUT OF HAZELWOOD, MISSOURI (1980)
A 450 mile pipeline for Koch Industries out of Wichita, Kansas. This pipeline ran from Wood River, Illinois to Williams Bro's pipeline and Tank farm in Iowa. This project included major River crossings, and a docking facility along the Missouri and Mississippi Rivers.
SHELL PIPELINE FROM HOUSTON, TEXAS TO BATON ROUGE, LOUISIANA (1978)
This pipeline project was for a ethylene pipeline that went from Houston, Texas to Baton Rouge, Louisiana. Levee crossings, River crossings, Railroad crossing permit drawings, Highway crossing permit drawings, Route Sheets and ownership drawings.
PIPELINE GATHERING SYSTEMS FOR PANHANDLE EASTERN PIPELINE CO., IN BRIGHTON, COLORADO (1972)
A system of gas pipelines for a large natural gas gathering system covering a large portion of Colorado. |
|